Northbound and Southbound Hwy 7/85
· Reduced speed to 70 km/h
· Lane Reductions for staged construction with the use of temporary concrete barrier, TC-54’s, crash trucks, construction signage.
· Long-term single lane closures on Highway 7/85 southbound and northbound collector lanes are in effect.
Northbound
· Express Lanes – Lane 1 closed nightly August 24 and 25, 2026 from 7:00 pm to 5:00 am, Express Lane 2 - 3.75 m + 1.0m Rt & 0.5 Lt Shoulder
· Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder
Southbound
· Express Lanes – All lanes closed nightly August 24, 25, 26 and 27, 2026 from 10:00pm to 5:00am
· Collector Lanes – All lanes closed August 23, 2026 from 9:00pm to 5:00am
Edna St On Ramp to Hwy 85 SB
· Closed August 23, 2026 from 9:00am to 5:00 am
· Closed nightly August 24 and 25, 2026 from 11:59 pm to 5:00 am
Wellington St WB On Ramp to Hwy 85 SB
· Closed August 23, 2026 from 9:00am to 5:00 am
· Closed nightly August 24 and 25, 2026 from 11:59 pm to 5:00 am
Wellington St N EB On-ramp to Hwy 7/85 SB
Wellington St N EB on-ramp to Hwy 7/85 SB will be closed November 29, 2025 and will remain closed until approximately November 2026.
Frederick Street – Full Closure
Frederick Street will be closed between Edna Street and Ann Street in the City of Kitchener