Northbound and Southbound Hwy 7/85

·       Reduced speed to 70 km/h

 ·       Lane Reductions for staged construction with the use of temporary concrete barrier, TC-54’s, crash trucks, construction signage.

 ·       Long-term single lane closures on Highway 7/85 southbound and northbound collector lanes are in effect.

  

Northbound

·       Express Lanes – Lane 1 closed April 30, 2026 from 12:01 am to 5:00 am

 ·       Express Lanes – Lanes 1 and 2 - 3.75 m + 1.0m Rt & 0.5 Lt Shoulder

·       Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder

 

Southbound

·       Express Lanes – Lane 1 closed April 30, 2026 from 12:01 am to 5:00 am

·       Express LanesLane 1 closed nightly May 4 and May 6, 2026 from 7:00 pm to 5:00 am.

·       Express Lanes – Lanes 1 and 2 closed nightly May 6 and May 8, 2026 from 7:00pm to 7:00am.

 ·       Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder

 

Ramps from Highway 7 at Bruce St and Highway 7 at Edna St Ramps

Ramps will be closed April 30, 2026 from 12:01am to 5:00am

 

Ramps to Highway 7 at Bruce St and Highway 7 at Edna St Ramps

Ramps will be closed April 30, 2026 from 12:01am to 5:00am

 

Wellington St N EB On-ramp to Hwy 7/85 SB

Wellington St N EB on-ramp to Hwy 7/85 SB will be closed November 29, 2025 and will remain closed until approximately November 2026.

 

Frederick Street – Full Closure

Frederick Street will be closed between Edna Street and Ann Street in the City of Kitchener

Next
Next

Northbound and Southbound Hwy 7/85