Northbound and Southbound Hwy 7/85
· Reduced speed to 70 km/h
· Lane Reductions for staged construction with the use of temporary concrete barrier, TC-54’s, crash trucks, construction signage.
· Long-term single lane closures on Highway 7/85 southbound and northbound collector lanes are in effect.
Northbound
· Express Lanes – All lanes closed nightly September 8, 9, and 10, 2026 from 10:00pm to 5:00am
All lanes closed September 11, 2026 from 11:00 pm to 7:00am
All lanes closed September 12, 2026, from 9:00pm to 7:00am
· Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder
Southbound
· Express Lanes – All lanes closed nightly September 10 and 11, 2026 from 10:00pm to 5:00am.
· Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder
· Vertical restriction 4.5m
Wellington St N EB On-ramp to Hwy 7/85 SB
Wellington St N EB on-ramp to Hwy 7/85 SB will be closed November 29, 2025 and will remain closed until approximately November 2026.
Frederick Street – Full Closure
Frederick Street will be closed between Edna Street and Ann Street in the City of Kitchener