Northbound and Southbound Hwy 7/85

  • Reduced speed to 70 km/h

  • Lane Reductions for staged construction with the use of temporary concrete barrier, TC-54’s, crash trucks, construction signage.

  • Long-term single lane closures on Highway 7/85 southbound and northbound collector lanes are in effect.

Northbound

  • Express Lanes – Lanes 1 and 2 - 3.75 m + 1.0m Rt & 0.5 Lt Shoulder

  • Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder

 

Southbound

  • Express Lanes – Lanes 1 and 2 - 3.75 m + 1.0m Rt & 0.5 Lt Shoulder

  • Collector Lanes – Lanes 1 & Lt Shoulder Closed – 0.0m & Lane 2 – 3.5+0.5m Rt Shoulder

 

Wellington St N EB on-ramp to Hwy 7/85 SB

Wellington St N EB on-ramp to Hwy 7/85 SB will be closed November 29, 2025 and will remain closed until approximately November 2026.

Frederick Street – Full Closure

Frederick Street will be closed between Edna Street and Ann Street in the City of Kitchener

Previous
Previous

Northbound and Southbound Hwy 7/85

Next
Next

Northbound and Southbound Hwy 7/85